Menu

Full Streetworks Qualification Northern Ireland

There are 16 units in total that make up 12 full qualifications. A breakdown of this is shown below. In order to obtain a Street Works ID card, at least one full qualification must be gained. 

Next Full Streetworks course is commencing Tuesday 8th November 2016

Qualifications and Associated Units

Operatives

Supervisors
01 Excavation in the road/highway 001, 002 and 003 S1 Monitor excavation in the
road/highway
001, 010 and 011
02 Excavation, backfilling and reinstatement – cold lay
001, 002, 003, 004, 005 and 006
S2 Monitor excavation, backfilling and reinstatement - construction layers
001, 010, 011, 012, 013 and 014
03 Reinstatement – hot and cold lay bituminous materials
001, 002, 006 and 007
S3 Monitor reinstatement – hot and cold lay bituminous materials
001, 010 and 014
04 Reinstatement of concrete slabs
001, 002 and 008
S4 Monitor reinstatement of concrete slabs
001, 010 and 015
05 Reinstatement of modular surfaces and concrete footways
001, 002 and 009
S5 Monitor reinstatement of modular surfaces and concrete footways
001, 010 and 016
06 Signing, lighting and guarding
002
S6 Monitor signing, lighting and guarding
010

Units of Competence for Trained Operatives

Unit 001 Location and avoidance of underground apparatus
Unit 002 Signing, lighting and guarding
Unit 003 Excavation in the road/highway
Unit 004 Reinstatement and compaction of backfill materials
Unit 005 Reinstatement of sub-base and road-base in non-bituminous materials
Unit 006 Reinstatement of cold-lay bituminous materials
Unit 007 Reinstatement of hot-lay bituminous materials
Unit 008 Reinstatement of concrete slabs
Unit 009 Reinstatement of modular surfaces and concrete footways


Units of Competence for Trained Supervisors

Unit 001 Location and avoidance of underground apparatus
Unit 010 Monitoring signing, lighting and guarding
Unit 011 Monitoring excavation in the road/highway
Unit 012 Monitoring reinstatement and compaction of backfill materials
Unit 013 Motoring reinstatement of sub-base and road-base in non-bituminous materials
Unit 014 Monitoring reinstatement of bituminous materials
Unit 015 Monitoring reinstatement of concrete slabs
Unit 016 Monitoring reinstatement of modular surfaces and concrete footways